Tap to Call (320) 828-7244
Home › Projects › Crosslake, June 2025

Metal and Shingle Roofing in Crosslake, MN June 2025

New Owens Corning Duration Designer shingles on the main roof of a Crosslake lake home, finished June 2025, with standing-seam steel on the low-slope sections. The flatter roofs were the weak spots on this house, so steel went on there by change order.

Crosslake, MinnesotaJune 2025Metal and Shingle Roofing8 finished photos
Finished job photos

Crosslake project gallery

Front of a dark log-sided Crosslake home with a dormer, a paver driveway and a new charcoal shingle roof
Front of a dark log-sided Crosslake home with a dormer, a paver driveway and a new charcoal shingle roof
Side of the Crosslake home with an upper deck on a post and the lake behind
Side of the Crosslake home with an upper deck on a post and the lake behind
Lake side of the Crosslake home with the new roof, a dormer and a spruce tree
Lake side of the Crosslake home with the new roof, a dormer and a spruce tree
Gable on the lake side of the Crosslake home with a red downspout above a rock bed
Gable on the lake side of the Crosslake home with a red downspout above a rock bed
Brown standing-seam steel over a shed dormer with a red gutter in Crosslake
Brown standing-seam steel over a shed dormer with a red gutter in Crosslake
Brown standing-seam steel roof with a skylight above a gable in Crosslake
Brown standing-seam steel roof with a skylight above a gable in Crosslake
Where the brown steel section meets the shingled roof and a red gutter in Crosslake
Where the brown steel section meets the shingled roof and a red gutter in Crosslake
Close view of the brown steel panel seams at the eave in Crosslake, MN
Close view of the brown steel panel seams at the eave in Crosslake, MN

Tap any photo to open it full size.

Scope

What we did

  • Replaced the shingles on the steep main roof and the front dormer
  • Put TitanLine snap lock steel on the low-slope sections, where shingles shed water slowest
  • Cut the siding back along the steel so the panel edge and flashing tuck in behind it
  • Finished that edge with 3.5 inch LP SmartSide trim, as the worksheet lists
  • Replaced the gutters and downspouts

At a glance

Roof
Steep gables, low-slope sections
Colors
Owens Corning Duration Designer, Black Sable
Walls
Snap lock steel, new gutters
Setting
Finished June 2025
In the photos

What you are looking at

Shingles need pitch. On a steep gable, water runs off fast and each course overlaps the one below it. On the flatter roofs over the shed dormers and the entry, water moves slowly and wind can push it back up under a shingle. Those sections got standing-seam steel instead, added to the job by change order.

The steel package on the worksheet is TitanLine snap lock. The panels lock to each other at a raised seam, and the fasteners hide under that seam, so no screw goes through the flat of the panel for water to find. One steel section has a skylight in it, which meant cutting the panels and flashing them around its frame.

Where a steel roof runs into a wall, the flashing has to go behind the siding, not on top of it. Our guys cut the siding back along those lines so the panel edge and flashing could tuck in, then closed the gap with 3.5 inch LP SmartSide trim. Water running down the wall lands on the steel instead of getting behind it.

The main roof is Owens Corning Duration Designer in Black Sable. At one spot a steel section meets a shingled valley, and that handoff between two roofing materials is where a careless job leaks. New gutters and downspouts carry everything off the eaves and away from the foundation.

Lake homes in Crosslake carry a lot of snow, and every spring that melt has to go somewhere. If your place has low-slope sections that keep giving you trouble, call (320) 828-7244 for a free roof inspection.

What happens when you book

No high-pressure sit. A local crew that was here before the storm and will be here after the warranty card is printed.

1

We inspect your roof and photograph everything, usually within a couple of days.

2

You get a straight answer: repair it, replace it, or leave it alone, with real numbers.

3

Your quote comes in writing, and nothing gets scheduled until you say yes.

We call you back within 30 minutes during business hours (Mon to Sat, 8am to 6pm). No pressure, no obligation.

By requesting an inspection, you agree that Committed 365 Roofing & Exteriors may call or text you at the number provided, including by automated means, about your request. Consent is not a condition of purchase. Msg & data rates may apply. Reply STOP to opt out. Privacy Policy.

Prefer to talk now? Call (320) 828-7244