Tap to Call (320) 828-7244
Home › Projects › Waite Park, April 2025

Roof Replacement in Waite Park, MN April 2025

A Waite Park home with a roof full of intersecting sections, re-roofed in April 2025 with brown blend shingles and finished with custom aluminum trim wraps. The shingles are Owens Corning TruDefinition Duration in Teak.

Waite Park, MinnesotaApril 2025Roof Replacement5 finished photos
Finished job photos

Waite Park project gallery

New brown blend shingle roof with a row of roof vents on a Waite Park, MN home
New brown blend shingle roof with a row of roof vents on a Waite Park, MN home
New shingles across intersecting roof sections in Waite Park
New shingles across intersecting roof sections in Waite Park
New shingles meeting a gable wall with step flashing in Waite Park
New shingles meeting a gable wall with step flashing in Waite Park
Valley and roof vents on the new Waite Park roof
Valley and roof vents on the new Waite Park roof
Rounded hip section of the new brown shingle roof in Waite Park
Rounded hip section of the new brown shingle roof in Waite Park

Tap any photo to open it full size.

Scope

What we did

  • Shingle roof replaced
  • Custom aluminum trim wraps

At a glance

Roof
Intersecting gables and hips
Colors
Owens Corning Duration, Teak
Walls
Light siding, aluminum trim wraps
Setting
Newer subdivision
In the photos

What you are looking at

The roof photos are all close work: a row of box vents along the main ridge, new shingles meeting a gable wall with step flashing, valleys where sections meet and a rounded hip where the ridge caps curve over the top.

Step flashing is the series of small metal pieces woven in with each shingle course where a roof meets a wall. It keeps water running down the roof instead of behind the siding.

The brown blend has tan and plum tones, and it pairs with the light siding of the house. Custom aluminum trim wraps finish the exterior trim.

Around it is a newer subdivision with curving streets and young trees, photographed in early spring before the grass greened up.

The box vents on the main ridge are gray and set evenly just below the peak. In the valley photo, a lower roof meets the main slope beside a light-sided gable, with two more vents set above the valley.

Under the Teak color, Duration is built around Owens Corning's SureNail strip, a woven fabric band in the nailing zone that gives each nail more to hold, and Owens Corning rates it for winds up to 130 mph and UL 2218 Class 3 impact. In Waite Park, holding tight in wind is the first defense against the snowmelt that follows a winter storm.

What happens when you book

No high-pressure sit. A local crew that was here before the storm and will be here after the warranty card is printed.

1

We inspect your roof and photograph everything, usually within a couple of days.

2

You get a straight answer: repair it, replace it, or leave it alone, with real numbers.

3

Your quote comes in writing, and nothing gets scheduled until you say yes.

We call you back within 30 minutes during business hours (Mon to Sat, 8am to 6pm). No pressure, no obligation.

By requesting an inspection, you agree that Committed 365 Roofing & Exteriors may call or text you at the number provided, including by automated means, about your request. Consent is not a condition of purchase. Msg & data rates may apply. Reply STOP to opt out. Privacy Policy.

Prefer to talk now? Call (320) 828-7244