Tap to Call (320) 828-7244
Home › Projects › Brainerd, October 2025

Gutter Replacement in Brainerd, MN October 2025

New 5 inch seamless gutters on a two-story home in Brainerd, finished October 2025. We ran downspouts off both the upper and lower roofs and gave each a tip-up extension to carry water away from the foundation.

Brainerd, MinnesotaOctober 2025Gutter Replacement6 finished photos
Finished job photos

Brainerd project gallery

Two-story gable end of a Brainerd home with a new brown downspout and extension
Two-story gable end of a Brainerd home with a new brown downspout and extension
Low wing of the Brainerd home with a new brown gutter along the roof edge
Low wing of the Brainerd home with a new brown gutter along the roof edge
Corner of the roof edge with a brown gutter and downspout on rustic lap siding in Brainerd
Corner of the roof edge with a brown gutter and downspout on rustic lap siding in Brainerd
Long two-story wall of the Brainerd home with a brown gutter along the eave
Long two-story wall of the Brainerd home with a brown gutter along the eave
Back of the Brainerd home with shrubs and fall color
Back of the Brainerd home with shrubs and fall color
Rear wall of the home under the new gutter line in Brainerd, MN
Rear wall of the home under the new gutter line in Brainerd, MN

Tap any photo to open it full size.

Scope

What we did

  • 5 inch seamless gutters installed
  • One-story and two-story downspouts with tip-up extensions
  • Existing roof left in place

At a glance

Roof
Gutter job, existing roof kept
Colors
5 inch seamless gutters
Walls
Tip-up downspout extensions
Setting
Finished October 2025
In the photos

What you are looking at

Seamless gutters are formed on site from a coil of aluminum, so each run is one continuous piece from corner to corner. Without joints along the run, there are fewer places for a leak to start.

The gutters and downspouts are dark brown, matching the fascia and window trim. The house has rustic lap siding with wavy edges in a tan-brown stain, and the brown gutter line follows every eave.

A tip-up extension is the hinged piece at the bottom of a downspout. Folded down, it carries water away from the foundation. Folded up, it clears the way for a mower.

The tall gable end photo shows one of the two-story downspouts running from the upper eave to the ground beside an arborvitae, then kicking out across the leaves.

The photos were taken on a gray, wet day in late October with the oaks and maples turning and leaves covering the lawn.

The existing roof stayed in place on this job. The gray shingles over the garage wing and the main house were not part of the work.

Late fall is a good time to judge gutters. Once the leaves are down and before the snow comes, it is easy to see where water has been spilling over or pooling against the foundation.

What happens when you book

No high-pressure sit. A local crew that was here before the storm and will be here after the warranty card is printed.

1

We inspect your roof and photograph everything, usually within a couple of days.

2

You get a straight answer: repair it, replace it, or leave it alone, with real numbers.

3

Your quote comes in writing, and nothing gets scheduled until you say yes.

We call you back within 30 minutes during business hours (Mon to Sat, 8am to 6pm). No pressure, no obligation.

By requesting an inspection, you agree that Committed 365 Roofing & Exteriors may call or text you at the number provided, including by automated means, about your request. Consent is not a condition of purchase. Msg & data rates may apply. Reply STOP to opt out. Privacy Policy.

Prefer to talk now? Call (320) 828-7244