Tap to Call (320) 828-7244
Home › Projects › St. Cloud, October 2025

Roof and Siding Replacement in St. Cloud, MN October 2025

A St. Cloud ranch home with a new roof and new vinyl siding in a deep green-gray, finished in October 2025. The shingles are Owens Corning Duration.

St. Cloud, MinnesotaOctober 2025Roof and Siding Replacement6 finished photos
Finished job photos

St. Cloud project gallery

Back of a St. Cloud ranch home with new gray-green vinyl siding and a new roof
Back of a St. Cloud ranch home with new gray-green vinyl siding and a new roof
Wide view of the St. Cloud home with new siding under fall trees
Wide view of the St. Cloud home with new siding under fall trees
Long side of the St. Cloud home with new dark green siding and white trim
Long side of the St. Cloud home with new dark green siding and white trim
Corner of the St. Cloud home with new siding, window trim and downspout
Corner of the St. Cloud home with new siding, window trim and downspout
New gray-green siding and white downspout on the St. Cloud home
New gray-green siding and white downspout on the St. Cloud home
Gable end of the St. Cloud home with new siding around a window
Gable end of the St. Cloud home with new siding around a window

Tap any photo to open it full size.

Scope

What we did

  • Shingle roof replaced
  • Vinyl siding replaced
  • Siding color upgrade added by change order: Smart Style Expressions Color Collection, as listed on the job worksheet
  • Rotten roof decking replaced

At a glance

Roof
Ranch gable roof
Colors
Owens Corning Duration shingles, white edges and gutters
Walls
New deep green-gray vinyl siding
Setting
Big shade trees
In the photos

What you are looking at

The siding color was an upgrade added by change order, a deep green-gray from the color collection named on the worksheet. White window trim, white soffit and fascia, and white gutters and downspouts frame it.

The windows have wide white trim surrounds that stand out against the darker wall. The basement windows are glass block, and a ductless mini-split unit sits on the back wall.

On the roof side of the job, rotten decking was replaced before the new shingles went on. Soft or rotted decking will not hold nails well, so it has to come out once it is exposed.

The photos were taken on a bright fall day, with yellow leaves on the lawn, a big shade tree in the back yard and a patio set up outside the back door.

Duration is built around Owens Corning's SureNail strip, a woven fabric band in the nailing zone, and Owens Corning rates it for winds up to 130 mph. Nails that hold through a St. Cloud summer storm are the same nails that keep wind-driven snow from lifting an edge in January.

What happens when you book

No high-pressure sit. A local crew that was here before the storm and will be here after the warranty card is printed.

1

We inspect your roof and photograph everything, usually within a couple of days.

2

You get a straight answer: repair it, replace it, or leave it alone, with real numbers.

3

Your quote comes in writing, and nothing gets scheduled until you say yes.

We call you back within 30 minutes during business hours (Mon to Sat, 8am to 6pm). No pressure, no obligation.

By requesting an inspection, you agree that Committed 365 Roofing & Exteriors may call or text you at the number provided, including by automated means, about your request. Consent is not a condition of purchase. Msg & data rates may apply. Reply STOP to opt out. Privacy Policy.

Prefer to talk now? Call (320) 828-7244