Cold Spring project gallery





Tap any photo to open it full size.
What we did
- Tore off and reshingled the house and the attached garage in one job
- Worked the new shingles in around three dormers, where water collects against the walls
- Set a row of box vents along the main ridge so warm, damp attic air has a way out
- Flashed both flue pipes and the plumbing vent where they pass through the roof
At a glance
- Roof
- 1.5-story roof, three dormers
- Colors
- Architectural shingles
- Walls
- Box vents, two flues flashed
- Setting
- Finished October 2025
What you are looking at
A story-and-a-half house puts the upstairs rooms right under the roof, with dormers giving them headroom and windows. Each dormer adds two short valleys and a wall where shingles meet siding. Those spots take the water running off the slope above, so the new rows have to be lapped in with care at every one.
With the upstairs tucked under the roof, there is not much attic space, and heat from the rooms reaches the roof boards quickly. The row of box vents along the main ridge lets that warm air out. In winter, moving air keeps the underside of the roof cold, which helps stop snow from melting on top and refreezing at the eaves.
Two metal flue pipes come through this roof, the kind that vent a furnace or water heater. Each one sits on a metal flashing base worked into the new shingles, and the plumbing vent got the same treatment. Every pipe through a roof is a hole, and the flashing is what keeps that hole dry.
The attached garage steps down at one end of the house, and its roof was replaced along with the main house. Doing both at once puts one roof on the whole building, with no older section left to wear out first. When the work was done, the finished roof was photographed from above by drone.
Dormer walls are a common place for water to get into a story-and-a-half house, and the first sign is often a stain on an upstairs ceiling. If you are seeing one, call (320) 828-7244 for a free roof inspection.